PPS agent mockup: four MVP 1 services, three agents
Start from the OODA dashboard for the whole picture, walk through one service in order, or pick a role in View as. Every screen also opens from the menu.
AGENT 1Risk and inspection planning
Scores every facility, proposes the inspection plan, prepares the brief and drafts the report
MVP 1: PPS-025 inspection of facilities
AGENT 2Compliance and consumer protection
Pre-checks registrations and permits, checks documents, drafts comments and the TRC pack
MVP 1: PPS-002 and PPS-001 registrations; PPS-009 permit
AGENT 3Governance and assurance
Checks the quality of Agents 1 and 2 against officers' decisions; logs every action; monthly report
MVP 1: All four services
PPS-025
Inspection of facilities, gas and petroleum
Operations team signs off
Agent 1, risk and inspection planning
Sample file: Al Noor Fuel Depot LLC, Civil Defense escalation ESC-2026-0412
- Inspection planSection Head (Operations)
- Pre-inspection briefInspector
- Inspection reportInspector
PPS-002
House of Expertise registration
Gas team signs off
Agent 2, compliance: registration pre-check
Sample file: Crescent TPI Services LLC, UP-PPS-002-0117, round 2
- My queuePPS reviewer
- Pre-check, 15 itemsPPS reviewer
- Document checkPPS reviewer
- Engineers and staffPPS reviewer
- Draft commentsPPS reviewer
PPS-001
Gas systems company registration
Gas team signs off
Agent 2, compliance: registration pre-check
Sample file: Gulfline Gas Systems LLC, new; Bayline Gas Contracting LLC, renewal
- My queuePPS reviewer
- Pre-check, 20 itemsPPS reviewer
- Draft commentsPPS reviewer
- Approval of a renewalSection Head
PPS-009
Buying and selling permit, high risk
Petroleum products team signs off
Agent 2, compliance: permit pre-check
Sample file: Harbour Fuel Trading LLC, UP-PPS-009-0881
- Intake and routingLCS specialist
- Permit pre-checkPermit reviewers
- TRC packTRC member
What each role sees (View as)
| Role | Screens |
|---|---|
| Section Head (Ops) | Inspection plan, Inspection report, OODA dashboard |
| PPS Inspector | Inspection plan, Pre-inspection brief, Inspection report |
| PPS Reviewer | My queue, all services, Pre-check, Document check, Engineers and staff, Draft comments, Pre-check, new, Draft comments, Rules and checklists |
| LCS Specialist | Intake and routing, Permit pre-check, TRC pack |
| Permit Reviewer | My queue, all services, Permit pre-check |
| TRC Member | TRC pack |
| Section Head | Approval, renewal, PPS performance |
| Director | OODA dashboard, Agent assurance, Approval, renewal, PPS performance |
| Rule owner | Rules and checklists |
For all services
OODA dashboard: the three agents, one risk view across both domains, and the decisions waiting for a person.
Rules and checklists: the working sheet rules and thresholds, versioned; the rule owner confirms the clauses.
PPS performance: flow, rework and SLA across the 42 services, for the Director.
Audit log and Ask the Regulation follow in a later release.
Rules and checklists: the working sheet rules and thresholds, versioned; the rule owner confirms the clauses.
PPS performance: flow, rework and SLA across the 42 services, for the Director.
Audit log and Ask the Regulation follow in a later release.
Mockup: IDs, rules, checklists and SLAs from the PPS working sheet; companies, people and numbers are samples. The agents recommend and draft; a named DoE officer decides.
My queue
AI recommendation: human decidesApplications assigned to you, pre-checked against the checklist and if-then rules of each service. Stage SLAs from the PPS service working sheet.
14
In my queue
4
Stage SLA ends within 2 working days
6
Gaps to confirm
5
Complete, ready to recommend
| Application | Applicant | Service | Round | Agent pre-check | Agent suggests | Stage SLA |
|---|---|---|---|---|---|---|
| UP-PPS-002-0117 | Crescent TPI Services LLC | PPS-002 House of Expertise, new | 2 | 4 gaps | Return for Modification | Day 13 of 15 |
| UP-PPS-001-0342 | Bayline Gas Contracting LLC | PPS-001 Gas systems company, renewal | 3 | 20 of 20 items | Approve | Day 12 of 15 |
| UP-PPS-009-0881 | Harbour Fuel Trading LLC | PPS-009 Buying and selling, high risk | 1 | 2 gaps | Return for Modification | Day 4 of 5 |
| UP-PPS-001-0388 | Gulfline Gas Systems LLC | PPS-001 Gas systems company, new | 1 | 3 gaps | Return for Modification | Day 6 of 15 |
| UP-PPS-005-0410 | Oasis Residences Tower 2 | PPS-005 No Objection Certificate | 1 | Complete | Approve | Day 3 of 15 |
| UP-PPS-004-0219 | Desert Rose Gas Services | PPS-004 Annual maintenance contract | 1 | Fee unpaid | On Hold (R-PPS-004-05) | Day 2 of 15 |
| UP-PPS-015-0077 | Westbay Storage Terminal LLC | PPS-015 Storage of petroleum products | 2 | 1 to confirm | Manual Review | Day 2 of 5 |
| UP-PPS-003-0156 | Coastline Valves Trading | PPS-003 Material and equipment vendor | 1 | Complete | Approve | Day 1 of 15 |
| UP-PPS-018-0560 | Silverline Lubricants Co. | PPS-018 Renewal of a permit | 1 | Complete | Approve | Day 1 of 5 |
Stage SLAs: registration review 15 working days, then Section Head 5 and Director 2. Permit reviewers 5 working days; the overall permit KPI is 25 working days. Decision types and rule IDs come from the working sheet; the reviewer decides every file.
Crescent TPI Services LLC
AI recommendation: human decidesUP-PPS-002-0117 | PPS-002 Registration of House of Expertise companies, new | Round 2 | Step 2: Review and Recommendation, day 13 of 15
Registration checklist, 15 items: 7 pass, 4 gaps, 1 to check, 1 to judge, 2 optional
| Checklist item (working sheet) | What the agent found | Rule | Result |
|---|---|---|---|
| Commercial licence with inspection, testing, certification activity | DED licence CN-2210457: activity present, valid to 14 Mar 2027 | R-PPS-002-02 | Pass |
| Articles of Association | Present; company name matches the licence | R-PPS-002-01 | Pass |
| Office facility contract | Expired on 30 Sep 2026 | R-PPS-002-04 | Gap |
| ADCDA ISTIFAA (office) | Issued for Office 803; the contract is for Office 1204 | R-PPS-002-03 | Gap |
| MoL (MOHRE) staff list | Lists both nominated engineers | R-PPS-002-01 | Pass |
| Engineers' credentials and DoE Engineer Approval | 1 of 2 engineers qualify; see Engineers and staff | R-PPS-002-03 | Gap |
| Tools and equipment register with calibration | Thickness gauge calibration expired 2 Aug 2026 | R-PPS-002-04 | Check |
| ISO 17020 accreditation (ENAS, ADQCC, MoIAT) | ENAS, valid to 2028; scope covers pressure equipment | R-PPS-002-04 | Pass |
| ISO 9001 quality system certificate | Valid to 2027 | R-PPS-002-04 | Pass |
| Financial and audit reports, last 3 years | 2 years; company established 2024 | R-PPS-002-03 | Judge |
| Undertaking letter; service fee AED 2,000 | Signed; receipt attached | R-PPS-002-05 | Pass |
| Reference projects; ICV certificate | Not provided: optional for new firms and in the first year | Optional |
Agent recommendation
Return for Modification
Gaps on 4 checklist items under R-PPS-002-03 and R-PPS-002-04; 1 calibration item to check; financials for your judgement.
Workflow and SLA
PPS ReviewerDay 1315 working days
Section HeadNext5 working days
DirectorThen2 working days
Data used
DS-PPS-002-01 application record; -02 uploads; -03 registration procedure; -04 House of Expertise guideline; -05 decision workflow. DED licence through the Unified Platform.
Document check: office facility contract
AI recommendation: human decidesUP-PPS-002-0117 | Crescent TPI Services LLC | Checklist item: Office facility contract | Rules R-PPS-002-03 compliance and R-PPS-002-04 validity
SCANNED
TENANCY CONTRACT (sample)
Contract no. TC-2025-118204
Landlord: Sample Properties LLC
Tenant: Crescent TPI Services LLC
Premises: Office 1204, Sample Tower, Al Reem Island, Abu Dhabi
Use: commercial office
Period: 01 Oct 2025 to 30 Sep 2026
Annual rent: AED 96,000
Signed by both parties
read in Arabic and English
Fields read from the document, compared with the application and the licence
| Field | In the document | In the application or DED | Result |
|---|---|---|---|
| Tenant name | Crescent TPI Services LLC | Crescent TPI Services LLC (DED) | Match |
| Office address | Office 1204, Sample Tower | Office 1204, Sample Tower | Match |
| Use | Commercial office | Office facility required | Match |
| Valid to | 30 Sep 2026 | Submitted 12 Nov 2026 | Expired |
R-PPS-002-04, Validity/Expiry, High: any required licence, certificate, contract or document is expired. Then Return for Modification: request a valid or renewed document. Human override allowed.
Same check in this file
ADCDA ISTIFAA: office number differs from the contract
Gap
Equipment register: one calibration certificate expired
Check
ISO 17020 and ISO 9001: valid on the submission date
Pass
Engineers and staff: Crescent TPI Services LLC
AI recommendation: human decidesChecklist: engineers' credentials, at least 2 engineers per category with 10 years' experience, DoE Engineer Approval, and the MoL (MOHRE) staff list.
| Engineer | On MoL staff list | DoE engineer registration (PPS-030) | ADQCC certificate and ADOT job role | Experience (CV) | Result |
|---|---|---|---|---|---|
| Eng. A. Saleh | Yes | Registered, valid to Mar 2028 | Valid; role matches the scope | 14 years | Qualifies |
| Eng. R. Menon | Yes | Not found in the DoE register | Not provided | 11 years | No DoE approval |
| Eng. K. Haddad | Not found | Registered, valid to Aug 2027 | Valid; role matches the scope | 9 years | Below 10 years |
Category minimum
1 of 2
qualifying engineers; R-PPS-002-03, return for modification
DoE engineer register
The agent looks up each engineer in the PPS-030 register on the Unified Platform: registration, approved job role and expiry.
Internal data
Staff list
Read from the uploaded MoL (MOHRE) PDF and matched by name. A live MOHRE check needs a data-sharing agreement.
Partner access
The agent reads the uploaded documents and cross-checks names, roles and dates. It does not confirm that a certificate is genuine; the signed undertaking applies.
Draft comments to the applicant
AI recommendation: human decidesUP-PPS-002-0117 | Crescent TPI Services LLC | Drafted from the confirmed gaps and the rule response templates; edit, then send through the Unified Platform. ENAR
1. Office facility contractR-PPS-002-04 Validity
The uploaded office facility contract expired on 30 Sep 2026. Please upload a valid or renewed contract for Office 1204, Sample Tower, in the name shown on your commercial licence.
Template: Request a valid or renewed document.
2. ADCDA ISTIFAAR-PPS-002-03 Compliance
The ADCDA ISTIFAA certificate is issued for Office 803, while the office facility contract is for Office 1204. Please upload the ISTIFAA certificate for the declared office.
Template: Return with the non-compliant requirement and corrective action.
3. EngineersR-PPS-002-03 Compliance
The House of Expertise guideline requires at least two engineers per category with 10 years' experience and DoE Engineer Approval. Eng. R. Menon has no DoE engineer registration. Please nominate a second qualifying engineer, or apply for registration under PPS-030 first.
Template: Return with the non-compliant requirement and corrective action.
4. Tools and equipment registerR-PPS-002-04 Validity
The calibration certificate of the ultrasonic thickness gauge expired on 2 Aug 2026. Please upload a valid calibration certificate.
Included after the reviewer confirmed the check.
Nothing is sent automatically. Every edit is logged.
Gulfline Gas Systems LLC
AI recommendation: human decidesUP-PPS-001-0388 | PPS-001 Registration of Gas Systems Companies, new | Category requested: B | Round 1 | Step 2: Review and Recommendation, day 6 of 15
Registration checklist, 20 items: 15 pass, 3 gaps, 1 to check, 1 optional
Commercial licence (DED) with gas systems activity
Pass
Articles of Association
Pass
Office and workshop contracts
Pass
ADCDA ISTIFAA, office and workshop
Gap
MoL (MOHRE) staff list
Pass
Organisation chart
Pass
Asset register: tools, equipment, software
Pass
Gas vehicles and DoE trading permits
Check
Technical staff details
Pass
ADQCC competency certificates
Gap
ISO 9001, 14001, 45001
Pass
Undertaking letter
Pass
ICV certificate
Optional
Financial and QMS audit reports, 3 years
Pass
Emergency response teams and vehicles
Pass
24/7 toll-free emergency number
Pass
Customer service call centre
Pass
Emergency Response Plan
Pass
Training plan and monthly awareness logs
Gap
Service fee receipt
Pass
Agent recommendation
Return for Modification
Gaps under R-PPS-001-01 and R-PPS-001-03; one expired trading permit under R-PPS-001-04.
Category B
RequestedCategory BEvidence2 engineers, 6 technicians, 3 gas vehiclesCriteriaTo confirm with PPS
The agent checks the category once PPS confirms the criteria per category.
Workflow and SLA
PPS ReviewerDay 615 working days
Section HeadNext5 working days
DirectorThen2 working days
Renewal every year; ICV becomes mandatory at renewal.
Draft comments to the applicant
AI recommendation: human decidesUP-PPS-001-0388 | Gulfline Gas Systems LLC | PPS-001, new, Category B | Drafted from the confirmed gaps and the rule response templates; edit, then send through the Unified Platform. ENAR
1. ADCDA ISTIFAA, office and workshopR-PPS-001-01 Completeness
The ADCDA ISTIFAA certificate uploaded covers the office only. The registration guideline requires ISTIFAA for both the office and the workshop. Please upload the ISTIFAA certificate for the workshop declared in your facilities contract.
Template: Request the missing mandatory document.
2. ADQCC competency certificatesR-PPS-001-03 Compliance
Two of the six technicians listed in the technical staff details have no ADQCC competency certificate. Please upload valid certificates for both technicians, or update the staff details.
Template: Return with the non-compliant requirement and corrective action.
3. Training plan and monthly awareness logsR-PPS-001-01 Completeness
The gas safety and emergency response awareness logs for August and September 2026 are missing. Please upload the monthly logs for these two months.
Template: Request the missing mandatory document.
4. Gas vehicles and DoE trading permitsR-PPS-001-04 Validity
The DoE trading permit for one of the three declared gas vehicles expired on 5 Oct 2026. Please renew the permit and upload the valid copy.
Included after the reviewer confirmed the check against the Unified Platform permit record.
Nothing is sent automatically. Every edit is logged.
Approval: Bayline Gas Contracting LLC
AI recommendation: human decidesUP-PPS-001-0342 | PPS-001 Registration of Gas Systems Companies, renewal | Category B | Round 3 | Step 3: 1st line decision
Reviewer recommendation
Approve, Category B
Agent pre-check20 of 20 checklist items pass in round 3; rules R-PPS-001-01 to -06 clearFeeAED 6,000 paid (R-PPS-001-05)Category staffing4 engineers and 6 technicians on the MoL staff list; ADQCC certificates validRenewal itemsICV certificate provided (mandatory for renewal)Reviewer noteGaps from rounds 1 and 2 closed; documents valid into 2027.
History of the file
12 OctSubmitted on the Unified Platform
13 OctReturned: expired ISO 45001, missing asset register, emergency response plan not provided
28 OctResubmitted; returned: office address differs from the licence
10 NovResubmitted; all checklist items pass
16 NovReviewer recommends approval
Approval chain (DS-PPS-001-05)
PPS ReviewerRecommended15 working days
Section HeadYou, day 25 working days
DirectorNext2 working days
After the Director's final decision the Unified Platform issues the registration certificate. Annual renewal for gas systems companies.
Intake and routing
AI recommendation: human decidesNew petroleum products permit applications. The agent proposes the permit route, the security classification and the routing lists; the LCS specialist confirms. SLA 2 working days.
| Application | Applicant | Products | Route proposed | Classification proposed | Intake SLA | |
|---|---|---|---|---|---|---|
| UP-PPS-009-0881 | Harbour Fuel Trading LLC | 3 products, 1 High Risk | PPS-009, high risk | Open | Day 1 of 2 | Ready |
| UP-PPS-010-0904 | Delta Lubes Trading | 2 products, Low Risk | PPS-010, low risk | Open | Day 1 of 2 | Ready |
| UP-PPS-011-0217 | Northgate Petroleum Imports | Import, 1 product | PPS-011, MOEI review 3 days | Open | Day 2 of 2 | Due today |
| UP-PPS-015-0093 | Westbay Storage Terminal LLC | Storage, site in a restricted area | PPS-015 | Confidential? | Day 1 of 2 | Confirm basis |
| UP-PPS-009-0912 | Sandline General Trading | 1 product not in the Hazard Master | Manual review | Open | Day 1 of 2 | Class missing |
UP-PPS-009-0881 | Harbour Fuel Trading LLC
Risk routeOne selected product is High Risk in the Product Hazard Master: PPS-009 (R-PPS-009-02)
ClassificationOpen by default; no sensitive activity or location declared (R-PPS-009-03)
ReviewersPPS, HSE and Legal reviewer lists from the controlled annexes
ApproversPPS, HSE and Legal approver lists
Why the agent proposes this
Products matched to the Hazard Master
Trade licence linked as beneficiary
Classification and routing are hard gates
Harbour Fuel Trading LLC
AI recommendation: human decidesUP-PPS-009-0881 | PPS-009 Permit for buying and selling petroleum products, high risk | Form DoE-I-BS-01 | Classified: Open | Reviewer stage, day 4 of 5
DED/ADRA licensed activity cross-checkknockout gate, R-PPS-009-01Passed
Trade licenceCN-3318820, active, valid to 9 Jun 2027 (DS-PPS-009-11, Accela)ActivityTrading in petroleum products, activePermit matrixActivity maps to PPS-009; Reviewer approval unblocked
Form and evidence checks
| Item | What the agent found | Rule | Result |
|---|---|---|---|
| Risk route (Product Hazard Master) | One selected product is High Risk: routes to PPS-009 | R-PPS-009-02 | Pass |
| National Oil Company sale agreement | Required for the selected products; contract valid to 2027 | R-PPS-009-02 | Pass |
| ADCDA ISTIFAA for the office | Expiry in the form 12 Jan 2027; certificate says 12 Jan 2026 | R-PPS-009-04 | Inconsistent |
| Power of Attorney of the legal representative | Expired on 31 Oct 2026 | R-PPS-009-04 | Expired |
| Legal representative Emirates ID | Valid; name matches the Power of Attorney | R-PPS-009-01 | Pass |
| Products, annual quantities, areas, suppliers | All mandatory fields complete | R-PPS-009-01 | Pass |
| MoIAT conformity or lab certificate | Not required for these products by the matrix | N/A |
Agent recommendation
Return for Modification
2 items under R-PPS-009-04. The applicant has 30 calendar days to resubmit; the file returns to this stage, otherwise it is cancelled automatically (R-PPS-009-05).
Path to the permit
LCS intakeDone2 working days
ReviewersDay 45 working days
ApproversNext2 working days
TRC voteThen5 working days
Fee, permitAED 2,500KPI 25 days
After issue: MOEI trading register within 10 working days.
TRC pack: Harbour Fuel Trading LLC
AI recommendation: human decidesUP-PPS-009-0881 | PPS-009 Permit for buying and selling petroleum products, high risk | Trading Regulatory Committee | KPI day 18 of 25 since the complete resubmission
Final eligibility and completeness gate
DED/ADRA licensed activity: passed at the Reviewer stage
Pass
All return comments closed
Pass
Reviewers and Approvers cleared
Pass
Site visit
N/A
History of the file
27 OctSubmitted; intake: route PPS-009, classified Open
30 OctReturned by Reviewers: ISTIFAA expiry, power of attorney expired
11 NovResubmitted within 30 days; Reviewers and Approvers cleared
17 NovRouted to the TRC (R-PPS-009-06)
TRC votes
| Member | Vote |
|---|---|
| DoE, TRC Chairman | Approve |
| DoE, PPS | Approve |
| DoE, Licensing and Compliance | Approve |
| DED | Pending |
| DoE, Legal | Pending |
Majority decides; a tie goes to the TRC Chairman. Rejection comments are mandatory.
After the decision
FeeAED 2,500before issue
Permit issuedNextDED and TRC notified
MOEI registerThen10 working days
Inspection plan: January 2027
AI recommendation: human decidesPPS-025, planned and escalation paths. The agent scores every permitted facility in both domains and proposes the plan; the Section Head (Operations) approves it and assigns the teams.
1,240
Facilities scored, gas and petroleum
38
Inspections proposed for January
2
Escalations open: site visit within 48 hours
5
Entities above 5% repeat violations
Proposed visits, ranked by risk
| Facility | Domain, category | Score | Top reason | Trigger | Proposed |
|---|---|---|---|---|---|
| Al Noor Fuel Depot LLC | Petroleum, storage | 86 | Civil Defense report; 2 Medium findings open | Escalation | By 18 Nov |
| Seaview Mall | Gas, commercial LPG | 81 | AMC expired 30 Sep; past LPG storage finding | Planned | Week 1 |
| Desert Rose Gas Services | Gas, operator | 74 | 6% repeat violations across 9 buildings | R-PPS-025-09 | Week 1 |
| Westbay Storage Terminal | Petroleum, storage | 69 | Tank foundation finding open 74 days | Re-inspection | Week 2 |
| Coastal Lubricants Packaging | Petroleum, packaging | 58 | Conformity certificate expires in 21 days | Planned | Week 2 |
| Palm Residences Tower B | Gas, central system | 52 | NOC renewal overdue | Random | Week 3 |
| Northgate Petroleum Imports | Petroleum, import | 41 | New permit; no inspection yet | Planned | Week 4 |
Why Al Noor Fuel Depot scores 86
Escalation report, Civil Defense, 16 NovDS-PPS-025-07
2 Medium findings open since MarchDS-PPS-025-04
ADCDA certificate expired 2 OctADCDA
Repeat violations 7%, above the 5% KPIR-PPS-025-09
Escalation clock
Site visit within 48 hours
R-PPS-025-06; team assigned in 11 hours
MVP 1 scores with the PPS risk rules and the inspection history; the risk model on real data (D4) follows in January.
Pre-inspection brief: Al Noor Fuel Depot LLC
AI recommendation: human decidesESC-2026-0412 | PPS-025 escalation path | Civil Defense report, 16 Nov 21:40: fire alarm at the storage yard, Mussafah | Category: storage of petroleum materials
Category checklist, storage: 12 items pre-filled from DoE records
Trade licence (DED)
Updated
DoE permit, storage (PPS-015)
Updated
National company supply contract
Updated
EAD no objection certificate
Updated
ADCDA fulfilment certificate
Not fulfilled
MOEI registration
Updated
Emergency response and evacuation plan
On site
Product conformity certificate
On site
Transport contract
On site
Maintenance history, notarised
On site
Safety data and product specification sheets
On site
Other petroleum activities
On site
The inspector completes the checklist on the Unified Platform inspection form; items marked Updated come from DoE and partner records and are confirmed on site.
Facility record
PermitsPPS-015 storage, valid to Jun 2027; PPS-009 buying and selling
Last inspection12 Mar 2026: 2 Medium findings, tank T-3 foundation and pressure gauge calibration; not closed
IncidentsNone reported in 12 months (PPS-026)
Repeat violations7% over 3 years, above the 5% KPI
Team and clock
TeamProcess safety specialist; petroleum system expert
Assigned17 Nov 08:10, within 12 to 24 hours
Site visit due18 Nov 21:40, 48 hours (R-PPS-025-06)
Check on site first
Source of the alarm and the emergency shut-off at the loading bay; tank T-3 foundation; ADCDA certificate renewal; fire extinguishers and signage.
Inspection report: Al Noor Fuel Depot LLC
AI recommendation: human decidesESC-2026-0412 | Site visit 18 Nov 10:30 by the inspection team | Observations recorded by the inspector; the agent classifies each one by the PPS risk rules and drafts the report
Observations: 1 High, 2 Medium, 2 Low; 1 Annexure-A violation
| Observation (inspector) | Risk | Rule | Action proposed |
|---|---|---|---|
| Emergency shut-off at the loading bay defective | High | R-PPS-025-03 | Immediate corrective action; operations at the bay stop until fixed |
| ADCDA fulfilment certificate expired 2 Oct 2026 | Medium | R-PPS-025-02, -04 | Notice with correction timeline; Annexure-A: escalate to Technical and Regulation |
| Tank T-3 foundation damaged; open since March | Medium | R-PPS-025-02, -08 | Notice; follow-up re-inspection within 60 days |
| Signage partly missing at the loading area | Low | R-PPS-025-01 | Written advisory, 7 working days |
| 2 fire extinguishers past expiry | Low | R-PPS-025-01 | Written advisory, 7 working days |
The inspector can change any risk class with a reason; Agent 3 logs every change. Fines follow the controlled Annexure-A schedule, applied by Technical and Regulation.
Agent recommendation
Notice and escalation
One High observation and one Annexure-A violation. Draft report, notice text and the follow-up date are ready for your review.
Clocks
Draft reportReady24 hours, R-PPS-025-07
Section HeadNextOperations
EscalationThen10 working days
Re-inspection17 Jan60 days, R-PPS-025-08
Distribution (DS-PPS-025-08)
Civil Defense, for action; facility owner and operator; Technical and Regulation for the violation. 6 photos attached.
OODA dashboard: three agents, one risk view
AI recommendation: human decidesBoth domains: petroleum products trading and gas works in buildings. Agents observe and orient; a named DoE officer decides; agents draft the action and track the follow-up.
OBSERVE | Agents 1 and 2
1,240 facilities, 48 files in review, 2 escalations, partner data
ORIENT | Agents 1 and 2
Risk score 1 to 100 with reasons; pre-check gaps by rule
DECIDE | DoE officer
12 decisions waiting: 5 reviewer, 3 Section Head, 2 TRC, 2 inspection
ACT | officer; agents draft
Comments, notices, reports drafted; 9 follow-ups tracked
AGENT 1Risk and inspection planning
Duties: inspection (lead); enforcement with Agent 2
MVP 1: PPS-025 inspection of facilities
Facilities scored1,240
Visits proposed, January38
Escalations within 48 hours2 of 2
Re-inspections past 60 days4
A person decides: Section Head (Operations), inspector
AGENT 2Compliance and consumer protection
Duties: permitting and compliance (lead); enforcement with Agent 1
MVP 1: PPS-002, PPS-001 registrations; PPS-009 permit
Files pre-checked48
Gaps to confirm6
Gaps confirmed by reviewers92%
Comments drafted17
A person decides: reviewer, Section Head, Director, TRC
AGENT 3Governance and assurance
Duties: quality and governance of Agents 1 and 2 under the AI Use Policy
MVP 1: all four services, every agent action
Agent actions logged1,312
Final decisions by an agent0
Overrides with reason7
Drift alerts open1
A person decides: Director; DoE IT for the platform
Coordinator: cases passed between the agents this week
Agent 1 to Agent 2Expired ADCDA certificate found at Al Noor Fuel Depot: flagged on its PPS-009 and PPS-015 permit files
Agent 2 to Agent 1Desert Rose Gas Services: AMC fee unpaid and 3 returns; risk score raised, visit proposed in week 1
Top risk, both domains
| Al Noor Fuel Depot LLC | Petroleum, storage | 86 | Escalation; visit by 18 Nov |
| Seaview Mall | Gas, commercial LPG | 81 | AMC expired |
| Desert Rose Gas Services | Gas, operator | 74 | Repeat violations 6% |
Waiting for a person
| Inspection report, Al Noor Fuel Depot | Section Head (Operations) | Today |
| Registration, Crescent TPI Services | PPS reviewer | Day 13 of 15 |
| Permit, Harbour Fuel Trading | TRC | 2 votes pending |
Agent assurance
Agent 3Agent 3 checks every action of Agents 1 and 2 against the officers' decisions and the AI Use Policy, and prepares the monthly report to the Director.
1,312
Agent actions logged this week
0
Final decisions taken by an agent
94%
Agent findings confirmed by officers
1
Drift alert open
Quality checks this week
| Agent | Check | This week | Threshold | Status |
|---|---|---|---|---|
| Agent 2 | Gaps confirmed by reviewers | 92%, 184 of 200 | at least 85% | OK |
| Agent 2 | Overrides with reason, by rule | R-PPS-002-04: 4; R-PPS-009-04: 3 | review a rule above 3 | To rule owner |
| Agent 1 | Risk classes changed by inspectors | 3 of 41 observations | at most 10% | OK |
| Agent 1 | Share of facilities scored High | 18%, was 12% | change above 5 points | Drift alert |
| Agents 1 and 2 | Actions outside the decision boundary | 0 | 0 | OK |
| All | Rule versions in use | PPS-001, 002, 009, 025: v1.0 | approved by Section Head | OK |
Open item
Drift alert, Agent 1: two escalation cases raised the scores of 14 storage facilities. Review the weights with the Section Head (Operations) before the January plan.
Audit trail, latest
18 Nov 11:02Agent 1 classified 5 observations; inspector kept all
18 Nov 10:15Reviewer overrode R-PPS-002-04 with a reason
17 Nov 16:40Agent 2 drafted 4 comments; reviewer edited 1
Monthly report to the Director: quality, overrides, drift and incidents; first report 1 Dec.
Rules and checklists: PPS-002 House of Expertise
AdminLoaded from the PPS service working sheet on 18 Nov 2026. Changes are versioned and need Section Head approval before the agent uses them.
If-then rules
| Rule | Category | If | Then | Severity | Clause |
|---|---|---|---|---|---|
| R-PPS-002-01 | Completeness | A mandatory item or field is missing | Return for Modification | Medium | To confirm |
| R-PPS-002-02 | Eligibility | Applicant, activity or category not eligible | Reject | High | To confirm |
| R-PPS-002-03 | Compliance | Not compliant with procedure or guideline | Return for Modification | High | To confirm |
| R-PPS-002-04 | Validity/Expiry | A required document is expired | Return for Modification | High | To confirm |
| R-PPS-002-05 | Fees | Fee unpaid, pending or no receipt | On Hold | Medium | To confirm |
| R-PPS-002-06 | Risk | High safety or regulatory risk | Escalate | High | To confirm |
All six rules allow a human override. The working sheet cites the procedure or guideline generally; the PPS rule owner confirms the exact clause for each rule before go-live.
Thresholds from the checklist
Engineers per categorymin 2
Engineer experience10 years
AccreditationISO 17020
Quality systemISO 9001
Financial and audit reportslast 3 years
ICV certificatefrom 1st renewal
Registration fee, 3 yearsAED 2,000
Change log
18 Nov 2026Working sheet loaded: 6 rules, 15 checklist items, 5 data sources
NextRule owner confirms the clauses before the interface review
PPS performance
AI recommendation: human decidesFlow, rework and SLA across the 42 PPS services; refreshed daily. Targets from the working sheet, baselines from DoE, volumes illustrative.
11 days
Time to a permit today (baseline)
4 to 5
Review rounds per file (baseline)
48
Applications in review
6
Past the stage SLA
Targets by service family (working sheet)
| Family | Stages | Target | In review |
|---|---|---|---|
| Company registrations, PPS-001 to 003 | Reviewer, Section Head, Director | 15 + 5 + 2 working days | 9 |
| Petroleum products permits, PPS-009 to 016 | LCS, Reviewers, Approvers, TRC | 25 working days | 21 |
| Design approvals in MePs, PPS-007, 008 | Reviewer | 7 working days | 4 |
| AMC and NOC, PPS-004, 005 | Reviewer, Section Head, Director | Per procedure | 14 |
Returns by rule category, last 30 days
OODA view for the Director: observe the flow, orient on the causes of rework by rule, decide where to change rules or guidance, act through the reviewers.
Not part of this mockup
This screen follows in a later release. Back to the demo guide